London 4 Data Centre

- of IT Power
31MW
- Resilient Infrastructure
Colt tier 3
Hyperscale data centre with 31MW under construction
Colt DCS is currently building the first phase of our London Hayes Campus with Colt London 4 Data Centre now under construction.
This site has been designed to a Colt tier 3 specification and upon completion, it will deliver 31MW of IT power across 5 floors.
Built to meet the city’s growing appetite for cloud technology and the recent surge in AI demand, our Colt London 4 Data Centre is an excellent facility for cloud and AI service providers who require scalable capacity to support high performance computing (HPC) and increasing IT workloads. With phase 1 expected to complete in 2025, the site is already fully let.

Colt London 4 Data Centre specification sheet

Key features of our Colt London 4 Data Centre
Location
Connectivity
Sustainability
Operational Excellence
Onboarding & Support




London 4 CGI
A CGI video of the build process for our London 4 data centre.
“We are seeing the London data centre market grow at an impressive rate, with a significant level of demand being driven by scalable capacity to support increasing IT workloads. Our Colt London 4 Data Centre is an incredible hyperscale facility that will support this growth using the very latest technologies, whilst having access to the desired power and connectivity infrastructure by being in the prime area of West London”.
James Murphy, Project Manager.


