The design for our Colt Paris 3 Data Centre is underway. Having purchased land in Villebon-Sur-Yvette, this AI-Ready data centre will be the second of three facilities to be built on this site.
Designed to support the growing adoption of cloud technology and to address the cooling needs of high-density AI workloads, this new data centre will use a hybrid cooling approach that integrates traditional air with direct liquid-to-chip cooling techniques.
Once entirely operational, our Colt Paris 3 Data Centre will offer 32MW of IT power. 120MW of contracted power has been secured at this site, ensuring a reliable energy source for this data centre and the two additional facilities planned in Villebon-Sur-Yvette.